During
FinishedWe strip the house back, fix what is hidden, renew every service and finish every room.

During
FinishedWe see the house and drawings.
Written, priced stage by stage.
Planning, sign-off, party walls.
One team, one site contact.
Snagging, certificates, keys.
Older London houses often hide problems behind the plaster: undersized joists, old wiring, lead or iron pipework, damp and past alterations that were never done properly. A full refurbishment is the time to deal with them, because everything is open.
We start with a strip-out, so both we and your engineer can see what the house is really like, and agree any changes to the plan before rebuilding starts. From there the work follows a fixed order: structure, first fix services, plastering, second fix, then finishes.
Victorian and Edwardian houses need a lighter touch in places: lime plaster, original joinery and fireplaces worth keeping, and conservation area or listed building rules that limit what can change on the outside. We will point out anything that needs consent before work begins.
Usually it is quicker and safer to move out while the house is stripped back, rewired and replumbed. On some projects we can work floor by floor so that part of the house stays usable; we will say which approach suits your job at the quote stage.
We show you what we have found, explain the options and agree the cost before doing any extra work. Nothing is added to the bill without your approval.
We visit, then send a written quote.